NOTICE OF INVITATION TO BID
BID NO. BDC 12-11/12
The Department of Environmental Protection, Division of Recreation and Parks, Bureau of Design and Construction is soliciting formal competitive bids from certified or registered contractors licensed to work in the jurisdiction for the project listed below:
PROJECT NAME: Fred Gannon Rocky
SCOPE OF WORK: The contractor shall provide the necessary labor, materials, equipment, and supervision to move existing restrooms to location designated by Owner’s Representative; and to construct new restroom. Work is to include new sewage pump station, force main, and two new
Pursuant to Executive Order 07-126 and Section 255.252(3), F.S. the Department requires the proposed project shall be designed and constructed in accordance with green building standards where applicable.
PROJECT BUDGET: $150,000.00
PARK LOCATION:
PROJECT MANAGER: Randy Strange, Bureau of Design and Construction, Alfred B. Maclay Gardens State Park, 3540 Thomasville Road, Tallahassee, Florida 32309, Telephone Number: (850)488-5372, Fax Number: (850)488-1141.
MINORITY BUSINESS REQUIREMENT: The Department of Environmental Protection supports diversity in its Procurement Program and requests that all sub-contracting opportunities afforded by this bid embrace diversity enthusiastically. The award of sub-contracts should reflect the full diversity of the citizens of the State of
PREQUALIFICATION: When the total Bid including Alternates exceeds $200,000, each Bidder whose field is governed by Chapter 399, 455, 489, or 633, Florida Statutes, for licensure or certification, must submit the following prequalification data of their eligibility to submit bids 240 hours (10 days) PRIOR TO the Bid Opening date, unless the Bidder has been previously qualified by the Department of Environmental Protection for the current biennium (July 1 – June 30) of odd numbered years in accordance with subsection 60D-5.004(2), F.A.C., as evidenced by a letter from DEP to the Bidder, which letter shall be presented to DEP upon request. If the Department requires clarification or additional information, Bidder shall submit such information by 120 hours (5 days) prior to Bid Opening. Material submitted after those deadlines shall disqualify the Bidder.
INSTRUCTIONS: Any firm desiring a Project Manual for this project may obtain a copy by writing to the address or calling the telephone number below. A Compact Disk (CD) containing the plans and specifications will be available on September 23, 2011, Henderson Beach State Park, 4281 SR 20, Niceville, Florida 32578, Attention: Daniel Laird, Park Manager, Telephone: (850)837-7550, Fax: (850)650-0290.
BID SUBMITTAL DUE DATE: No later than 3:30 p.m. (ET), Tuesday, October 25, 2011 to the below address: Florida Department of Environmental Protection, Bureau of Design and Construction, 3540 Thomasville Road, Tallahassee, Florida 32309, Attention: Michael Renard, Construction Projects Administrator, Bureau of Design and Construction, (850)488-5372. The Department reserves the right to reject any or all bids.
BID POSTING DATE: No later than
NOTICE OF RIGHTS: Notice of Intent to Protest the Bid Specifications must be filed with (received by) the Agency Clerk, Lea Crandall, Department of Environmental Protection, Office of General Counsel, MS 35, 3900 Commonwealth Blvd., Tallahassee, FL 32399-3000, (850)245-2242, Fax: (850)245-2303, Lea.Crandall@dep.state.fl.us during the 72-hour period after Bid Specifications are posted on the Vendor Bid System. Failure to file a Notice of Intent to Protest or a formal, written Protest in accordance with Chapter 28-110, F.A.C., within ten days after the 72-hour period ends, as prescribed in Section 120.57(3), Florida Statutes, shall constitute a waiver of your right to an administrative hearing on the Bid Specifications under Chapter 120, Florida Statutes. Rules for bid protests can be found in Sections 120.569 and 120.57, F.S., and Chapter 28-110, Florida Administrative Code. A bid protester shall comply with these statutes and rules.