NOTICE TO CONSTRUCTION MANAGERS
The University of Florida Board of Trustees, announces that construction management services will be required for the project listed below:
Project No.: UAA-18
Project Name and Location: South West Stadium Expansion,
The project consists of approximately the construction of additional new 31,332 (GSF) and the renovation of existing 18,380 (GSF) of offices, meeting rooms, weight room, Interactive Exhibition/Reception area, Gator Room, and support space for the University of Florida’s Football Program. The new addition to the stadium must fit contextually with adjacent facilities while also conveying a prominent sense of arrival. This addition to the South West corner of the stadium will serve as a focal point for one of the main intersections on campus,
The contract for construction management services will consist of two phases. Phase I is pre-construction services, for which the construction manager will be paid a fixed fee. Phase I services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 100% Construction Document phase. If the GMP is accepted, phase II, the construction phase, will be implemented. In phase II of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase I of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager's contract. Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability, critical path scheduling expertise; cost estimating; cost control ability; quality control capability; and qualification of the firm's personnel, staff and consultants. Finalists will be provided with a copy of the building program and the latest documentation prepared by the project architect/engineer, a deion of the final interview requirements and a copy of the standard
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed project specific “Construction Manager Qualifications Supplement” available from the website: www.facilities.ufl.edu Proposals must not exceed 40 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals that do not comply with these requirements or do not include the requested data will not be considered. No submittal material will be returned. All applicants must be licensed to practice as general contractors in the State of
Eight (8) bound copies of the required proposal must be received in the Facilities Planning & Construction Division office by 3:00 p.m. (local time), on Friday, June 12, 2006. Facsimile (FAX) submittals are not acceptable and will not be considered.
Facilities Planning and Construction
232 Stadium /
Telephone: (352)392-1256
FAX: (352)392-6378
Internet: www.facilities.ufl.edu