6C8-5.009: Use of University Facilities
NOTICE TO CONSTRUCTION MANAGERS
The Florida International University Board of Trustees announces that construction management services will be required for the project listed below:
Project Name and Number:
Project Location: This facility will be located at
Project Description: The Project consists of site improvements and the construction of a multi-story educational facility sited north of the Heath and Life Sciences II Bldg. located on the northeast quadrant of
The contract for construction management services will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, construct ability analysis, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 100% Construction Document phase. If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager's contract. Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability, critical path scheduling expertise; accelerated construction scheduling; cost estimating; cost control ability; quality control capability; and qualification of the firm’s personnel, staff and consultants. Finalists will be provided with a copy of the building program, a description of the final interview requirements, and a copy of the standard construction management agreement. The Selection Committee may reject all proposals and stop the selection process at any time. The construction manager shall have no ownership, entrepreneurial or financial affiliation with the selected architect/engineer involved with this project.
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed Construction Manager Qualifications Supplement form. Proposals must not exceed 80 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals, which do not comply with these requirements or do not include the requested data, will not be considered. No submittal material will be returned.
All applicants must be licensed to practice as general contractors in the State of
The Construction Manager Qualifications Supplement (CMQS) form and the Project Fact Sheet may be obtained from the web-site http://facilities.fiu.edu (find project under Selection Process Information). Requests for meetings by individual firms will not be granted. Once the firm acquires the required forms, questions may be directed to Facilities Planning at (305)348-4090.
Six (6) bound copies of the required proposal data will be submitted to: Selection Committee. Facilities Planning,
Submittals must be received by