Notice of Proposed Rule

DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
Electrical Contractors’ Licensing Board
RULE NO: RULE TITLE
61G6-7.001: Specialty Electrical Contractors
PURPOSE AND EFFECT: The Board proposes to amend the rule in order to add another description for a residential electrical contractor.
SUMMARY: Another description for a residential electrical contractor will be added to the rule.
SUMMARY OF STATEMENT OF ESTIMATED REGULATORY COSTS: No Statement of Estimated Regulatory Cost was prepared.
Any person who wishes to provide information regarding a statement of estimated regulatory costs, or provide a proposal for a lower cost regulatory alternative must do so in writing within 21 days of this notice.
SPECIFIC AUTHORITY: 489.511(5) FS.
LAW IMPLEMENTED: 489.503(14), 489.505(19), 489.511(5) FS.
IF REQUESTED WITHIN 21 DAYS OF THE DATE OF THIS NOTICE, A HEARING WILL BE SCHEDULED AND ANNOUNCED IN FAW.
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE IS: Anthony Spivey, Executive Director, Electrical Contractors’ Licensing Board, 1940 North Monroe Street, Tallahassee, Florida 32399-0750

THE FULL TEXT OF THE PROPOSED RULE IS:

61G6-7.001 Specialty Electrical Contractors.

The following types of specialty electrical contractors may apply to be certified under the provisions of Part II, Chapter 489, Florida Statutes, and Chapter 61G6-5, F.A.C., above. In order to be admitted to a specialty contractor examination, the person must show 6 years of comprehensive training, technical education, or broad experience on the type of electrical or alarm system work for which certification is desired.

(1) through (2) No change.

(3) Residential Electrical Contractor. The scope of certification includes installation, repair, alteration, addition to, replacement of or design of electrical wiring, fixtures, appliances, apparatus, raceways, conduit, or any part thereof, in a 1, 2, 3, or 4 family residence not exceeding 2 stories in height, and accessory use structures in connection with the residence. The electrical service installed or worked upon is limited to single phase, 400 ampere single service.

(4) through (5) No change.

Specific Authority 489.511(5) FS. Law Implemented 489.503(14), 489.505(19), 489.511(5) FS. History–New 1-2-80, Amended 7-29-84, 10-14-84, Formerly 21GG-7.01, Amended 2-23-86, 12-24-87, 6-21-89, 3-3-92, Formerly 21GG-7.001, Amended 1-28-96, 12-25-96, 6-11-97, 12-24-97, 7-19-98, 10-7-99, 2-17-00, 4-30-01, 4-30-03, ________.


NAME OF PERSON ORIGINATING PROPOSED RULE: Electrical Contractors’ Licensing Board
NAME OF SUPERVISOR OR PERSON WHO APPROVED THE PROPOSED RULE: Electrical Contractors’ Licensing Board
DATE PROPOSED RULE APPROVED BY AGENCY HEAD: May 18, 2007
DATE NOTICE OF PROPOSED RULE DEVELOPMENT PUBLISHED IN FAW: May 4, 2007