SEALED BIDS ARE REQUESTED FROM QUALIFIED CONTRACTORS LICENSED AS REQUIRED BY THE State of
PROJECT NO: 204067 ACCOUNTING CODE: 132G76.L1
PROJECT NAME ANDLOCATION: POWE LINE UPGRADE, PHASE III
FOR: Department of Military Affairs, Construction and Facility Management Office, Robert F. Ensslin, Jr. Armory, 2305 State Road 207, St. Augustine, Florida 32086.
PROJECT DESCRIPTION: The primary Base Bid of this project will consist of work as outlined on Attachments A-1 and A-2. The Base Bid will entail the replacement of a total of 18 existing power poles; one (1) of which will be a 45', Class IV pole, and seventeen (17) will be 40', Class III poles. Pole replacement will be accompanied by appropriate hardware removal and re-attachment to new poles. Attachment A-1 reflects pole replacement, reframing and/or hardware replacement as specified.There is no conductor replacement to be done in conjunction with Attachment A-1.
Attachment A-2 reflects pole replacement, reframing, hardware replacement PLUS conductor replacement.
Alternate Additive #1 will consist of work as outlined on Attachments B-1 and B-2. Attachment B-1 reflects pole replacement, reframing, and/or hardware replacement as specified. There is NO conductor replacement to be done in conjunction with Attachment B-1.
Attachment B-2 reflects pole replacement, reframing, hardware replacement, PLUS conductor replacement.
Alternate Additive #2 will consist of work as outlined on Attachment C-1. Attachment C-1 reflects pole replacement, reframing, and/or hardware replacement as specified. There is NO conductor replacement to be done in conjunction with Attachment C-1.
Alternate Additive #3 will consist of work as outlined on Attachments D-1 and D-2. Attachment D-1 reflects pole replacement, reframing, and/or hardware replacement as specified. There is NO conductor replacement to be done in conjunction with Attachment D-1.
Attachment D-2 reflects pole replacement, reframing, hardware replacement, PLUS conductor replacement. Insulators, switches, preformed ties, and mounting hardware shall be sized accordingly for system voltage and replaced as designated on the attachments. All hardware will be either Hubbel or Chance Hardware manufacturers.
Locations of existing poles, verification of any potentially effected utilities, and distance measurements should be field verified by the contractor prior to bidding and job start.
NOTE: ANY AND ALL COPPER OF ANY SORT REMOVED DURING THIS PROJECT WILL REMAIN THE PROPERTY OF THE OWNER,
The Non-Technical Specifications Level IV and V are considered to be applicable to this solicitation and award of contract when made and are made a part hereof.
The State of
NO VERBAL STATEMENTS MADE BY ANY STATE OF
A FULL COPY OF THE SOLICITATION AND ALL ADDITIONAL DOCUMENTATION, DRAWINGS AND NON-TECHNICAL SPECIFICATIONS MUST BE DOWNLOADED FROM THE MY FLORIDA MARKETPLACE VENDOR BID SYSTEM AT http://fcn.state.fl.us/owa_vbs/owa/vbs_www.main_menu on myflorida.com.