Notice of Request for Proposals
Imperial Polk
Phase 2
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the Imperial Polk County B.O.C.C., Phase 2 South County Jail Expansion (Site Development,
01B |
Final Cleaning |
08C |
Overhead Coiling Doors |
11C |
Food Service Equipment |
02A |
Site Work |
09A |
Security Plaster |
13A |
Pre-Engineered |
02C |
Fencing |
09D |
Acoustical Treatment |
|
|
02C |
Landscaping |
09E |
VCT Flooring |
14A |
Elevators |
03A |
Cast-in-place & Tilt-wall Panels |
09F |
Resinous Flooring |
14B |
Material Hoisting Equipment |
03C |
Hollow Core Slabs |
09G |
Painting |
15A |
Fire Sprinkler System |
04A |
Masonry |
10A |
Miscellaneous Accessories |
15B |
Plumbing |
05A |
Structural & Miscellaneous Steel |
10B |
Architectural & Security Louvers |
15C |
HVAC |
06A |
Cabinets |
10C |
Interior Signs |
16A |
Electrical &Low Voltage Systems |
07A |
Roofing |
11A |
Projection Screens |
|
|
07B |
Waterproofing & Joint Sealants |
11B |
Detention Equipment & Systems |
|
|
A pre-proposal meeting for this project will be held
Deadline for receipt of All Proposal Packages has been set for
All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:
Jenny Sanchez, Estimator
Phone: (727)535-6407 – Fax: (727)539-8485
This project will be performed inside the existing perimeter fencing. All personnel will require approval by the Polk County Sherriff’s Office prior to entry including but not limited to background checks.
Imperial Polk County B.O.C.C. and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available on or about
Imperial Polk County B.O.C.C and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by