The State of
PROJECT NUMBER: APD 07240000
PROJECT: WILLIAM J. (BILLY JOE)
RENOVATIONS AND ADDITIONS
PREQUALIFICATION: The Owner accepts bids from those firms which demonstrate current relevant licensure with the Florida Department of Business and Professional Registration by submittal of a copy of that license or certificate with their bid and compliance with the pre-qualification requirements as stated hereinbefore and in the project specifications.
The work includes but is not limited to the demolition and removal of existing elevated boardwalks. Installation of new boardwalks with composite material and 6' wide concrete sidewalks, installation of sanitary sewer grinder pumps at each existing cabin, new cabins, and dining lodge kitchen. Existing Group Cabins to have existing rusted floor beam joist hangers, bolts and fasteners replaced. Renovate Group Cabins to meet ADA standards and finishes, install new fire alarms, install new intercom systems, install new fire sprinkler systems, provide new cement board siding and paint. Replace HVAC equipment and ductwork. Existing Family Cabins to have existing rusted floor beam joist hangers, bolts and fasteners replaced. Install new emergency generator, completely new water, sewer, and electrical site utilities. Renovation of Dining Lodge Kitchen and equipment, renovate bathrooms to meet
PERFORMANCE BOND AND LABOR AND MATERIAL BOND: If the construction award is $100,000.00 or more, a Performance Bond and Labor and Material Payment Bond are required.
BID DATE AND TIME: Sealed bids will be received at the architect’s office,
PRE-BID INSPECTION: The pre-bid inspection will be gathering at the
PROPOSAL: Bids must be submitted in full accordance with the requirements of the drawings, specifications, bidding conditions and contractual conditions, which may be examined and obtained for $300.00 refundable from the architect:
DAG ARCHITECTS INC.
TELEPHONE: (850)837-8152
CONTRACT AWARD: The bid tabulation and Notice of Award Recommendation will be posted by 2:00 p.m. (Local Time), on January 28, 2008, at the Architects Office. In the event that the bid tabulation and Notice of Award Recommendation cannot be posted in this manner, then all bidders will be otherwise notified. Any protests of the bid must be made within 72 hours of posting of the results. “Failure to file a protest within the time prescribed in Section 120.53(5), Florida Statutes, shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.” If no protest is filed per Section B-21 of the Instructions to Bidders, “Notice and Protest Procedures: the Owner will award the contract to the qualified, responsive low bidder in accordance with Chapter 60D-5, F.A.C.