REMODEL/RENOVATE FOR CLASSROOMS/LABS (PHASE 1)
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the St. Petersburg College remodel renovate for classrooms/labs Phase 1 Olympia Building, Tarpon Springs Campus hereby solicits sealed proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:
The Scope of Work for this project includes but is not limited to the following:
Construction includes a new water cooled chiller for the
A pre-proposal meeting will be held at: 3:00 local time; 3/12/08 at the following location:
St. Petersburg College Tarpon Springs Campus
School Café on the corner of Klosterman and U.S.19
Directly adjacent to the campus
Deadline for receipt of All Proposal Packages has been set for 2:00 p.m. on March 25, 2008. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Prequalification documents must be submitted by March 7, 2008, to be considered for this project. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:
Joe Ostrowski, Senior Estimator
Phone: (727)535-6407 – Fax: (727)539-8485
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available March 7, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by 3/14/08. The Owner and Architect will not accept calls regarding this project.