Notice of Request for Proposals #3 – Revised
Annex 2 Epicenter
Project #186-J-07-1
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the St. Petersburg College Annex 2 Epicenter Project #186-J-07-1 hereby solicits sealed proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:
A Build out of a 41,055 sqft building shell for a new office, storage facility and related site work is included. The building has been gutted out. The interior of the building includes casework, new doors, frames and hardware. The scope will include painting of new partitions and soffits, acoustical ceilings, VCT, carpet, porcelain tile, projector screens, projector mounts, window treatment and accessories. New plumbing and fixtures are included. A fire sprinkler system will be added throughout the building. The site will require sitework, landscaping and irrigation.
Peter R. Brown strongly requests your attendance to a Non mandatory pre-proposal meeting for the trades referenced above which will be held at 10:00 a.m. (Local Time), April 2, 2008. and will be held at the following location:
Project Site
14155 –
Deadline for receipt of Proposal Packages has been set for 2:00 p.m., April 15, 2008
Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Deadline for Prequalification is March 21, 2008. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:
Joe Ostrowski, Senior Estimator
Phone: (727)535-6407 – Fax: (727)539-8485
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Proposal packages will be available March 17, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by April 4, 2008. The Owner and Architect will not accept calls regarding this project.