Notice of Bid/Request for Proposal

DEPARTMENT OF EDUCATION
New College of Florida
New College of Florida

NOTICE TO CONSTRUCTION MANAGERS

New College of Florida announces that construction management services will be required for the project listed below:

Project No.:   NCF-03

Project:          Phase I – New Academic/Administration Building

                        Phase II – New International and Area Studies Building

                        New College of Florida

                        Sarasota, Florida

Estimated Construction Budget:      Phase I – $8,480,000

                                                                Phase II – $1,770,000

Phase I of the project consists of the construction of a new Academic/Administration Building to replace the existing Palmer A, C, D and E buildings on New College Campus

Phase II of the project consists of the construction an academic facility to functions supporting International and Area Studies. It is anticipated that project funding for this Phase will be fully in hand no later than the summer of 2008. However, since Phase II of this project is contingent upon private funding as well as State of Florida appropriations not yet in hand, the project can not proceed until full funding is received. As such, the College reserves the right, at any time, to defer or terminate this project and/or initiate a separate Construction Manager selection process.

The contract for construction management services for each Phase of the work will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP). The development of the GMP is planned at the completion of the 50% Construction Document phase. If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts, encouraging the inclusion of Minority Business enterprises (MBEs). Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager’s contract.

RESPONSE DUE DATE: By 4:00 p.m. (Local Time), July 9, 2008

Proposals are to be sent to: Mr. Ken Perlowski, Director, Facilities Planning and Construction, 5800 Bay Shore Road, PHS 104, Sarasota, FL 34243-2109, (941)487-4690.

INSTRUCTIONS

Submit ten (10) bound copies and one (1) PDF copy on a compact disk with a Table of Contents and tabbed sections in the following order:

1.     Letter of Interest detailing the firm’s qualification to meet the above referenced selection criteria.

2.     A current New College Experience Questionnaire and Contractor’s Financial Statement.

3.     Résumés of proposed staff and staff organizations.

4.     Any examples of project reporting manuals, schedules, past experience and examples of similar projects completed by the firm.

5.     References from prior clients received within the last five years.

The New College Experience Questionnaire and Contractor’s Financial Statement as well as instructions and the project fact sheet are available from New College Facilities Planning and Construction at the address shown on the bottom of this advertisement or may be downloaded from New College’s website www.ncf.edu/facilities. Proposals must not exceed 80 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals that do not comply with these requirements or do not include the requested data will not be considered. All applicants must be licensed to practice as general contractors in the State of Florida at the time of application. Corporations must be registered to operate in the State of Florida by the Department of State, Division of Corporations, at the time of application. As required by Section 287.133, Florida Statutes, a construction management firm may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction management firm must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

All proposal information submitted becomes the property of New College of Florida, will be placed on file, and not returned. Applications that do not comply with the instructions set forth above and/or do not include the qualification data required will be considered improper and disqualified. Proposals submitted by qualified firms shall be evaluated in accordance with regulations of the Florida Board of Governors.

Shortlist Selection process: From the proposals selected, the College shall shortlist a minimum of three (3) firms and a maximum of five (5) firms for further interviews.

The selected firm or firms will be required to be registered with MyFloridaMarketPlace before a contract can be executed. However they will be exempt from the one percent fee.

Submit proposals to:

Ken Perlowski, Director

Facilities Planning and Construction

New College of Florida

5800 Bay Shore Road

PHS 120

Sarasota, FL 34243

Telephone: (941)487-4690

FAX: (941)487-4239

kperlowski@ncf.edu