NOTICE TO CONSTRUCTION MANAGERS
The
Project No. UCF-516
Project and Location: Recreation and
The phased design and construction of new athletics facilities spaces in this phase may include but not be limited to:
Fitness Space – weight room – free weights/ Cardio and Selectorized
Mac Gymnasium – additional courts
Multi-purpose rooms – combative/ group exercise-movement exploration
Outdoor
Boldering Wall
Outdoor Pool – Six lane lap with deep water
Athletic Training room
Racquetball Courts
Retail/ Food Service
Renovation of the existing Wellness center – First Floor office and meeting rooms for RWC use – office/ storage/ custodial/maintenance and or laundry space
Relocation and design for the current
Support Facilities for the Outdoor Park
Pavilion type structure at
The contract for construction management services will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 50% Construction Document phase (or other phase, if applicable. If so, change this reference). If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts, encouraging the inclusion of Minority Business Enterprises (MBEs). Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager’s contract.
Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability; qualification of the firm's personnel, staff and consultants. Finalists will be provided with a copy of the building program and the latest documentation prepared by the project architect/engineer, a deion of the final interview requirements and a copy of the standard
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed
Carefully review the Construction Management Contract and General Condition’s documents. Submitting a proposal for this project constitutes complete agreement with and acceptance of the terms and conditions contained within these documents. These documents can be found on our website at www.fp.ucf.edu with the advertisement.
All applicants must be licensed to practice as general contractors in the State of
The Construction Manager Qualifications Supplement forms and the Project Fact Sheet may be obtained by contacting: Gina Seabrook, Office of Facilities Planning, University of Central Florida, 4000 Central Florida Boulevard, Orlando, FL 32816-3020, (407)823-2166, Fax: (407)823-5141, Email: gseabroo@mail.ucf.edu.
The project fact sheet for the Physical Sciences Building and the CMQS Form may be found on the Facilities Planning home page. Our Internet address is: www.fp.ucf.edu.
Four (4) bound copies of the required proposal data shall be submitted to: Mr. Peter Newman, Facilities Planning,