NOTICE TO CONSTRUCTION MANAGERS
The University of Florida Board of Trustees announces that CM-At-Risk services will be required for the project listed below:
Project: UF-323, Chemistry/Chemical Biology Building and Renovation of Existing Facility, Gainesville, Florida.
This project will provide approximately 100,000 GSF of modern undergraduate teaching laboratories, classrooms, auditorium, teaching support, graduate research laboratories, and offices. The new Building will provide a centralized home for lower-level undergraduate chemistry instruction. It will also provide state-of-the-art research facilities for faculty and graduate students working in the areas of chemical biology and chemical synthesis. This project will include new construction and renovation of existing facilities to comply with the Program requirements. The new building must fit contextually in the historic district of campus with a thoughtful and high-performance design that enhances the “front door” to the University. Comprehensive site (and jobsite) planning must account for traffic patterns, accessibility, routing of utilities, landscape and hardscape elements, and views to and from existing buildings.
The estimated construction budget is approximately $49,000,000, including site improvements and utilities, interior voice/data, and other site-specific allowances. The University is interested in utilizing Building Information Modeling (BIM) as a tool for improving quality of construction documents from the models for clash detection, eliminate or greatly reduce the RFIs, electronic exchange information, prefabrication of material / equipment from models, constructability reports, site logistic planning, and visualization; thereby reducing cost of construction and shortening the construction schedule. Gold LEED (Leadership in Energy and Environmental Design) certification by the U.S. Green Building Council is mandatory and an independent consultant will provide commissioning services throughout design and construction.
The contract for construction management services will consist of two phases, pre-construction and construction. Construction will also be phased. Pre-construction services will begin at the Advanced Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; and development of at least two Guaranteed Maximum Price (GMP) proposals, including site work, new building and renovation of the existing facilities based on 100% Construction Documents. If the GMP proposal(s) are accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager’s contract.
Applicants will be evaluated on the basis of their past performance, experience, personnel, references, bonding capacity, workload, and responses to questions posed both in the shortlist and interview phases. The Selection Committee may reject all proposals and stop the selection process at any time.
At the time of application, the applicant must be licensed to practice as a general contractor in the State of Florida and, if the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida.
Applicants desiring to provide construction management services for the project shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet, and other background information. The proposal shall be one hard copy limited to 40 single-sided OR 20 double-sided, consecutively-numbered pages and one CD containing color pages of the same information as the hard copy and shall include:
1. A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services, schedule, and other goals and considerations as outlined in the Project Fact Sheet and facilities program.
2. Company information and signed certification.
3. A completed, project-specific “CM Qualifications Supplement” (CMQS) proposal. Applications on any other form will not be considered.
4. Resumes, LEED accreditation, and other pertinent credentials for all proposed staff.
5. Proof of the applicant’s corporate status in Florida (if applicable) and a copy of the applicant’s current contracting license from the appropriate governing board.
6. Proof of applicant’s bonding capacity.
As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction manager must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.
Unsigned proposals or proposals containing expired or invalid licenses will be disqualified. Submittal materials will not be returned.
The project-specific CMQS forms, instructions, Project Fact Sheet, facilities program, UF Design Services Guide, UF Design and Construction Standards, standard University of Florida Owner-CM agreement, UF General Terms and Conditions, and other project and process information can be found on the Facilities Planning and Construction website.
Finalists may be provided with supplemental interview requirements and criteria as needed.
Provide the number of copies prescribed in the Project Fact Sheet. Submittals must be received in the Facilities Planning and Construction office by 3:00 p.m. (Local Time), Friday, January 23, 2009. Facsimile (FAX) submittals are not acceptable and will not be considered.