PETER R. BROWN CONSTRUCTION
Notice of Request for Proposals
East Lake Tarpon Special Fire Control District
New Fire Station 57
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the East Lake Tarpon Special Fire Control District.
New Fire Station 57 hereby solicits proposals for the following trades for the referenced project in accordance with the proposal documents to include but not limited to the following:
02A |
Site Work |
07A |
Metal Roofing & Soffit |
09E |
Carpet |
02B |
Demolition |
07B |
Insulation |
09F |
Paint & Concrete Sealer |
02C |
Fencing (Chain Link) |
07C |
Waterproofing & Joint Sealants |
|
|
02D |
Landscape and Irrigation |
08A |
Doors, Frames, Hardware & Installation |
10A |
Specialties |
03A |
Cast-in-Place Concrete |
08B |
Coiling Doors |
11A |
Projection Screens |
04A |
Masonry |
08D |
Aluminum Storefront |
11B |
Residential Appliances |
05A |
Miscellaneous Steel |
09A |
Stucco |
15A |
Fire Sprinklers |
06A |
Rough Carpentry |
09B |
Drywall |
15B |
Plumbing |
06B |
Cabinets |
09C |
Ceramic Tile |
15C |
HVAC |
|
|
09D |
Acoustical Treatment |
16A |
Electrical |
A pre-proposal meeting will be held at 3:00 p.m., local time; Tuesday September 12, 2006 at the following location:
Eastlake Tarpon Fire Control District |
|
Fire Station 57 |
|
|
|
|
|
Deadline for receipt of All Proposal Packages has been set for 2:00 p.m., on Thursday September 28, 2006. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All trade contractors must be pre-qualified prior to submitting a proposal. A copy of the pre-qualification form can be received by contacting: Peter R. Brown Construction, Inc., Estimating Department, (727)535-6407, or faxing a letter of interest to (727)539-8485.
Eastlake Tarpon Fire Control District and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available August 28, 2006. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
Eastlake Tarpon Fire Control District and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by September 14, 2006. The Owner and Architect will not accept calls regarding this project.