Notice of Bid/Request for Proposal

DEPARTMENT OF EDUCATION
University of Florida
UF-350 Commissioning Professional

NOTICE TO PROFESSIONAL CONSULTANTS:

The University of Florida Board of Trustees announces that Professional Services in the disciplines of engineering and architecture for Total Building Commissioning will be required for the project listed below:

Project: UF-350, East Campus Data Center (Gainesville, FL)

The facility comprises the construction of a new data center, consisting of a net 5,000 square-feet of “near-Tier 3” (redundant, concurrently maintainable) space for Enterprise Systems and other mission-critical computing operations infrastructure, plus a net 5,000 square-feet of “Tier 0” (general-purpose, non-redundant) space for research computing and similar non-mission-critical computing capacity.

Current plans call for an initial capacity of 250KW for the near-Tier 3 space, and 350KW for the “Tier 0” space. The near-term plans call for a ramp-up of each space to accommodate 500KW of computing capacity in each of the (near-Tier 3 and Tier 0) floors, for a total of 1000KW. Initial construction must include capability to scale up non-disruptively to this level and beyond (via increased power-density, and possibly building expansion) to accommodate future demand for computing facility-capacity.

The scope of services shall include design phase peer review, completion and maintenance of the Owner's Project Requirements (OPR) document, development of the Commissioning Plan and Commissioning Specifications, and construction phase pre-functional, functional, and performance testing for mechanical, electrical, building automation, and building envelope systems. The consultant shall also support project efforts to achieve higher-than-normal energy efficiency and attain Gold LEED certification.

Blanket professional liability insurance will be required for this project in the amount of $1,000,000.

INSTRUCTIONS:

Firms desiring to apply for consideration shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet for Commissioning Consultants, and other background information. The proposal shall be limited to (no hard covers) 10 double-sided, consecutively-numbered pages and shall include:

1.             A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services.

2.             A completed Commissioning Services Proposal Form using the project-specific version available at the UF Facilities Planning & Construction website. Applications on any other form will not be considered.

3.             Resumes and copies of the applicant's current Professional Registration Certificate(s) from the appropriate governing board, corporate charter(s) if applicable, LEED accreditation, and other pertinent credentials.

At the time of application, the applicant must possess current design Professional Registration Certificate(s) from the appropriate governing board; must be properly registered to practice its profession in the State of Florida; and, if the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida. As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected applicant must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

Incomplete proposals will be disqualified. Submittal materials will not be returned.

The Commissioning Services Proposal Form, Project Fact Sheet, UF Design Services Guide, UF Design & Construction Standards, FP&C non-technical specifications, standard University of Florida Owner-Commissioning Consultant agreement, and other project and process information can be found on the Facilities Planning & Construction website. Finalists may be provided with supplemental interview requirements and criteria as needed.

Provide the number of copies prescribed in the Project Fact Sheet. Submittals must be received in the Facilities Planning and Construction office by 3:00 p.m. (Local Time), Friday, September 4. Facsimile (FAX) submittals are not acceptable and will not be considered.

Facilities Planning and Construction

232 Stadium / P. O. Box 115050

Gainesville, FL 32611-5050

Telephone: (352)273-4000, Fax: (352)273-4034

Internet: www.facilities.ufl.edu