Notice of Change/Withdrawal

DEPARTMENT OF TRANSPORTATION
Rule No.: RULE TITLE
14-85.022: Permits
NOTICE OF CHANGE
Notice is hereby given that the following changes have been made to the proposed rule in accordance with subparagraph 120.54(3)(d)1., F.S., published in Vol. 36 No. 27, July 9, 2010 issue of the Florida Administrative Weekly.

In response to comments from the Joint Administrative Procedures Committee, paragraph 14-85.022(2)(a), F.A.C., is being amended to clarify the cap on Logo permit fees and is modified as follows:

     (a) The following charts show the groupings for both AADT and population. Annual fees for participation in the Logo Sign Program are computed based upon the Annual Average Daily Traffic (AADT) at each interchange, the population of the area surrounding the interchange, market conditions, and the costs of the program. The following charts show the groupings for both AADT and population:

 

 

AADT Grouping

> 

<=

Group

0

30,000

0

30,000

75,000

1

75,000

175,000

2

175,000

 

3

Population Grouping

>=

< 

Group

0

5,000

1

5,000

50,000

2

50,000

200,000

3

200,000

500,000

4

500,000

 

5

 

The following chart shows the weighted values assigned to each factor:

 

Fee Formula Factors

AADT

230 600

 

Population

400

 

Cost

1000

 

 

The fee for each interchange is computed as follows:

(AADT Group x AADT Factor) + (Population Group x Population Factor) + Cost Factor

Under no circumstances shall calculated fee exceed $3500.00 for an interchange in an urban area, or $2500.00 for an interchange outside an urban area.

EXAMPLE: For an interchange with an AADT of 60,000 and a population of 75,000, the fee is computed as follows:

     AADT Group = 1

     Population Group = 2 3

     (1 x 230 600) + (2 3 x 400) + 1000 = $2,030 $2,800

The fees calculated above are for a mainline logo sign and ramp logo signs in both directions of the interstate. At interchanges where the configuration only allows access to the business in a single direction, one mainline logo sign and one ramp logo sign will be provided and the fee will be one-half (1/2) that computed for both directions.