On November 16, 2010 the Federal Highway Administration granted location and design concept acceptance for the following Federal-Aid project:
Financial Project Number: 415963-1-32-01
Federal-Aid Project Number: SFTL 195 R
Project Description: This project entails the widening of approximately 1.23 miles of Palm Coast Parkway from Cypress Point Parkway/Boulder Rock Drive to Florida Park Drive. The widening of Palm Coast Parkway would consist of adding one lane in each direction to the outside of the existing four-lane divided roadway. The project will consist of bridge rail modification, paving, drainage, stormwater treatment ponds, streetscape and irrigation, signage and pavement markings, and signalization.
This project will now proceed to the next phase of development.