|
|
Notice of Proposed Rule
|
|
|
|
|
|
|
|
|
|
| BUREAU OF BEACHES AND COASTAL SYSTEMS - RULES AND PROCEDURES FOR COASTAL CONSTRUCTION AND EXCAVATION (PERMITS FOR CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE AND FIFTY-FOOT SETBACK) | 62B-33.002 | Definitions | 62B-33.004 | Exemptions from Permit Requirements | 62B-33.005 | General Criteria for Areawide and Individual Permits | 62B-33.0051 | Coastal Armoring and Related Structures | 62B-33.007 | Structural and Other Requirements Necessary for Permit Approval (Repealed) | 62B-33.008 | Application Requirements and Procedures for Areawide and Individual Permits | 62B-33.0081 | Survey Requirements | 62B-33.0085 | Application Fees | 62B-33.013 | Permit Modifications, Time Extensions, Renewals, and Reissuances | 62B-33.014 | Emergency Procedures | 62B-33.0155 | General Permit Conditions | 62B-33.024 | Thirty-Year Erosion Projection Procedures |
|
|
|
|
|
|
161.052, 161.053, 161.0535, and 161.085 |
|
161.052, 161.053, 161.0535, 161.054, and 161.085 |
|
12/8/2006 Vol. 32/49 |
|
From 12/8/2006 To 12/29/2006 (21 Days)
The public comment period for this notice has already expired.
|
|
No reference(s).
|