|
62-610.100 |
Purpose, and Applicability |
8/8/2021 |
|
62-610.200 |
Definitions |
8/8/2021 |
|
62-610.300 |
General Technical Guidance, Related Rules, Technical Publications and Forms |
8/8/2021 |
|
62-610.310 |
Engineering Report |
4/1/2021 |
|
62-610.320 |
Operation and Maintenance Requirements and Operating Protocols |
4/1/2021 |
|
62-610.330 |
Pretreatment Programs |
8/8/2021 |
|
62-610.400 |
Description of System |
1/9/1996 |
|
62-610.410 |
Waste Treatment and Disinfection |
1/9/1996 |
|
62-610.412 |
Monitoring of Reclaimed Water and Ground Water |
4/1/2021 |
|
62-610.414 |
Storage Requirements |
4/1/2021 |
|
62-610.417 |
Surface Runoff Control and Subsurface Drainage |
4/1/2021 |
|
62-610.418 |
Access Control and Advisory Signs |
4/1/2021 |
|
62-610.419 |
Application/Distribution Systems and Cross-Connection Control |
4/1/2021 |
|
62-610.421 |
Setback Distances |
4/1/2021 |
|
62-610.423 |
Hydraulic Loading Rates |
1/9/1996 |
|
62-610.425 |
Cattle Grazing |
8/8/1999 |
|
62-610.426 |
Edible Crops (Repealed) |
2/16/2012 |
|
62-610.450 |
Description of System |
4/1/2021 |
|
62-610.451 |
Minimum System Size |
4/1/2021 |
|
62-610.460 |
Waste Treatment and Disinfection |
4/1/2021 |
|
62-610.462 |
Reliability and Operator Staffing |
4/1/2021 |
|
62-610.463 |
Monitoring and Operating Protocol |
8/8/2021 |
|
62-610.464 |
Storage Requirements |
4/1/2021 |
|
62-610.466 |
Aquifer Storage and Recovery (ASR) |
8/8/2021 |
|
62-610.468 |
Access Control and Advisory Signs |
8/8/1999 |
|
62-610.469 |
Application/Distribution Systems and Cross-Connection Control |
4/1/2021 |
|
62-610.471 |
Setback Distances |
4/1/2021 |
|
62-610.472 |
Supplemental Water Supplies |
8/8/2021 |
|
62-610.473 |
Hydraulic Loading Rates |
4/1/2021 |
|
62-610.475 |
Edible Crops at Commercial Agricultural Operations |
4/1/2021 |
|
62-610.476 |
Toilet Flushing and Fire Protection |
4/1/2021 |
|
62-610.478 |
Construction Dust Control (Repealed) |
2/16/2012 |
|
62-610.479 |
Aesthetic Purposes (Repealed) |
2/16/2012 |
|
62-610.480 |
Other Reuse Applications |
4/1/2021 |
|
62-610.490 |
Permitting Concept (Repealed) |
2/16/2012 |
|
62-610.491 |
Additional Operation and Maintenance Requirements |
4/1/2021 |
|
62-610.500 |
Description of System |
4/1/2021 |
|
62-610.510 |
Waste Treatment, Disinfection, and Monitoring |
4/1/2021 |
|
62-610.514 |
Storage Requirements |
4/1/2021 |
|
62-610.516 |
Emergency Discharge |
1/9/1996 |
|
62-610.517 |
Surface Runoff Control and Subsurface Drainage |
4/1/2021 |
|
62-610.518 |
Access Control and Advisory Signs |
1/9/1996 |
|
62-610.521 |
Setback Distances |
4/1/2021 |
|
62-610.523 |
Design and Operation Requirements |
4/1/2021 |
|
62-610.525 |
Projects Involving Additional Levels of Preapplication Treatment |
8/8/2021 |
|
62-610.550 |
Description of System |
4/1/2021 |
|
62-610.553 |
Minimum System Size |
4/1/2021 |
|
62-610.554 |
Discharge to Class I Surface Waters |
4/1/2021 |
|
62-610.555 |
Discharge to Other Surface Waters |
4/1/2021 |
|
62-610.556 |
Land Application |
4/1/2021 |
|
62-610.560 |
Ground Water Recharge by Injection |
8/8/2021 |
|
62-610.562 |
Salinity Barrier Systems |
8/8/2021 |
|
62-610.563 |
Waste Treatment and Disinfection |
4/1/2021 |
|
62-610.564 |
Pilot Testing Program |
4/1/2021 |
|
62-610.567 |
Reliability and Operator Staffing |
4/1/2021 |
|
62-610.568 |
Monitoring and Operating Protocol |
8/8/2021 |
|
62-610.571 |
Setback Distances |
4/1/2021 |
|
62-610.573 |
Storage Requirements |
4/1/2021 |
|
62-610.574 |
Access Control, Advisory Signs, and Public Notification |
4/1/2021 |
|
62-610.575 |
Hydraulic Loading Rates |
1/9/1996 |
|
62-610.600 |
Description of System |
4/4/1989 |
|
62-610.610 |
Waste Treatment and Disinfection |
4/1/2021 |
|
62-610.613 |
Monitoring of Effluent and Ground Water |
4/1/2021 |
|
62-610.614 |
Storage Requirements |
4/1/2021 |
|
62-610.617 |
Surface Runoff Control |
4/1/2021 |
|
62-610.618 |
Access Control and Advisory Signs |
1/9/1996 |
|
62-610.621 |
Setback Distances |
4/1/2021 |
|
62-610.625 |
Design Influences |
1/9/1996 |
|
62-610.650 |
Description of System |
4/1/2021 |
|
62-610.652 |
Waste Treatment, Disinfection, and Monitoring |
8/8/2021 |
|
62-610.656 |
Storage Requirements |
4/1/2021 |
|
62-610.658 |
Access Control and Advisory Signs |
1/9/1996 |
|
62-610.660 |
Cross-Connection Control and Protection of the Reclaimed Water Supply |
1/9/1996 |
|
62-610.662 |
Setback Distances |
4/1/2021 |
|
62-610.668 |
Cooling Water Applications |
4/1/2021 |
|
62-610.669 |
Use of Reclaimed Water at Wastewater Treatment Plants |
4/1/2021 |
|
62-610.670 |
Industrial Discharge Limitations |
4/1/2021 |
|
62-610.800 |
Permitting Requirements |
8/8/2021 |
|
62-610.810 |
Classification of Projects as "Reuse" or "Disposal" |
4/1/2021 |
|
62-610.820 |
Reuse Feasibility Studies |
4/1/2021 |
|
62-610.830 |
Storage Lakes and Ponds |
4/1/2021 |
|
62-610.850 |
Protection of Surface Water and Ground Water Quality |
4/1/2021 |
|
62-610.860 |
Limited Wet Weather Discharge |
4/1/2021 |
|
62-610.865 |
Blending of Demineralization Concentrate with Reclaimed Water |
8/8/2021 |
|
62-610.870 |
Reporting and Enforcement |
8/8/2021 |
|
62-610.890 |
General Permit for Adding New Major Users to a Part III Reuse System |
8/8/2021 |