|   | 62-672.100 | General (Repealed) | 2/16/2012 | 
		  
				
                |   | 62-672.200 | Definitions | 7/19/2006 | 
		  
				
                |   | 62-672.300 | Construction of New Dams | 6/28/1999 | 
		  
				
                |   | 62-672.400 | Operational Requirements | 6/28/1999 | 
		  
				
                |   | 62-672.500 | Inspections | 6/28/1999 | 
		  
				
                |   | 62-672.550 | Contingency Plans | 6/28/1999 | 
		  
				
                |   | 62-672.570 | Non-Clay Phosphate Mining Impoundments | 6/28/1999 | 
		  
				
                |   | 62-672.600 | Construction of New Perimeter Earthen Dikes | 7/19/2006 | 
		  
				
                |   | 62-672.620 | Assessment of Existing Perimeter Earthen Dikes (Repealed) | 2/16/2012 | 
		  
				
                |   | 62-672.650 | Operational Requirements for Perimeter Earthen Dikes | 6/28/1999 | 
		  
				
                |   | 62-672.670 | Inspection and Maintenance Requirements for Perimeter Earthen Dikes | 6/28/1999 | 
		  
				
                |   | 62-672.700 | Construction of New Phosphogypsum Stacks | 6/28/1999 | 
		  
				
                |   | 62-672.720 | Assessment of Existing Phosphogypsum Stacks (Repealed) | 2/16/2012 | 
		  
				
                |   | 62-672.750 | Procedures for Raising Phosphogypsum Stacks | 7/19/2006 | 
		  
				
                |   | 62-672.760 | Procedures for Decanting Process Water from Top of Phosphogypsum Stack | 6/28/1999 | 
		  
				
                |   | 62-672.770 | Phosphogypsum Stack Inspection and Maintenance | 6/28/1999 | 
		  
				
                |   | 62-672.780 | Phosphogypsum Stack System, Operation Plans | 7/19/2006 | 
		  
				
                |   | 62-672.800 | Training | 6/28/1999 | 
		  
				
                |   | 62-672.850 | Contingency Plans | 6/28/1999 | 
		  
				
                |   | 62-672.870 | Emergency Measures | 7/19/2006 |